With 120+ projects delivered across UAE, our track record speaks for itself.

From landmark developments to large-scale infrastructure, delivered across UAE.
Dozers working

Our Landmark Projects

surfing ranch

Hudayriyat Island Surf Ranch

-Location: Hudayriyat Island, Abu Dhabi
-Client: MODON
-Main contractor: Fibrex
-Consultant: GHD
-Scope: Earth Work

The Middle East's first artificial surf ranch — a 78,000 m² wave basin. DTD's scope: cutting, backfilling, compaction, sub-base, and surf slope formation.

sharjah wheat farm

Maliha Agricultural Farm

-Location: Maliha Sharjah
-Client: Department of Agriculture and Livestock Government of Sharjah.
-Scope: Civil works for irrigation infrastructure

DTD delivered full civil works for the Al Maliha wheat farm — including 15+ km of irrigation pipeline, a 16,000 m³ irrigation pond, and a pumping station with 6 suction pumps supplying up to 60,000 m³/day, irrigating 400+ hectares of wheat land.

Ba Al Gaiylam

Ba Al Gaiylam Development

-Location: Al Bahiya, Abu Dhabi.
-Client: Aldar
-Main contractor: APCC
-Consultant: DAR
-Scope: Earth Work

Enabling works across 4M m² of desert land  cut & fill and compaction to prepare the site for development. DTD scope: 1.95M m³ excavation and 2.10M m³ backfilling, completed in a few months using 40+ machinery units.

Qasr Al Hosn restoration

Restoration and enhancement of the Qasr Al Hosn

-Location: Abu Dhabi
-Client: Department of Culture and Tourism.
-Scope: Earth work & Hardscape.

Restoration of Abu Dhabi's oldest fort into a cultural landmark — a finalist for the Architizer A+Award 2022. DTD delivered backfilling to level the ground and create a stable base for new structures, along with hardscape installation across the surrounding site.

Al Bahiya City Gas Network

Al Bahiya City Gas Network

-Location: Al Bahiya, Abu Dhabi
-Client: Musanada
-Main contractor: Bin Hafeez
-Consultant: DIWI
-Scope: Civil Work

DTD delivered all civil works for the Al Bahiya gas network including trench excavation and preparation, manhole casting and installation, and NDRC works.

NOYA Abu Dhabi

North Yas – Yas Living (NOYA-2), Yas Island

-Location: Yas Island, Abu Dhabi
-Client: Aldar
-Main Contractor: Fibrex
-Consultant: Arcadis
-Scope: Hardscape & Road Work

DTD delivered hardscape and road works for this prestigious residential development including tile installation for sidewalks and villas, alongside comprehensive roadworks across the site.

Qasr Al Jurf

Qasr Al Jurf Phase 2A

-Location: Al Jurf, Abu Dhabi
-Client: Emkaan
-Main contractor: Al Firas
-Consultant: OTAK
-Scope: infrastructure works

DTD delivered all infrastructure works for this development, including wet and dry utility systems: water supply, sewage and storm water networks, and electrical and telecommunications infrastructure.

Heavy Machine working in Hudayriyat

Al Naseem Residential Development, Hudayriyat Island

-Location: Hudayriyat Island, Abu Dhabi
-Client: Modon
-Main contractor: Fibrex
-Consultant: Parsons & Atkins
-Scope: Earth Work

DTD has delivered comprehensive earthworks and villa foundation works for approximately 900 residential villas, as part of this major residential development on Hudayriyat Island.

DTD in Top Golf Abu Dhabi

Top Golf – Yas Island

-Location: Yas Island, Abu Dhabi
-Client: Miral
-Main contractor: M4 Contracting
-Consultant: Ellisdon
-Scope: Infrastructure Work

DTD is working on full infrastructure services for this flagship leisure and entertainment development including wet and dry utilities, bulk earthworks, and site preparation works.

Hardscape in Hudayriyat

Al Naseem Residential Development, Hudayriyat Island

-Location: Hudayriyat Island, Abu Dhabi
-Client: Modon
-Main contractor: Fibrex
-Consultant: EllisDon & Parsons
-Scope: Hardscape

DTD is working on hardscape works for approximately 500+ villas including internal villa hardscape and sidewalk installation as part of this major residential development on Hudayriyat Island.